★ High-efficiency catalytic oxidation ferrous removal function;
★ The average daily water treatment efficiency is 50% more than that of ordinary processes;
★ Apart from the ferrous sludge and granular salt, no waste water is produced;
★ Low moisture content in the mud cake and solid waste reduction;
★ Make full use of the waste heat from the production and low operating power;
★ The reuse and treatment of water with different salt content to save water;
★ High operating stability and low operating costs;
★ Integrated and modularized with less land occupation;
★ Continuously automatic operation, and manpower is only required when unloading mud and collecting salt particles.
Daily average wastewater treatment capacity | 40m3/day |
Concentrated brine treatment capacity | 2m3/day |
Installed power | 36.5KW |
Staffing | Personnel assistance is required only when unloading mud and collecting salt |
Operating power | 17KW |
A Sucessful Conference in Bangkok Thailand (11th APGGC 2019)
19-12-3Sidelights of Dalishen Project by RITMAN
20-11-23Successful Launch of the Specific HDG Plant for Scaffolding of Huzhou Feijian
21-02-24th IZA Galvanizing Technology Symposium and Exhibition, Xuzhou China, 2017
18-11-2A Glimpse at Shenzhou Project Construction Site by RITMAN
20-11-24Another Fully Automated and Eco-friendly HDG Plant under Construction
22-03-5